iShares U.S. Energy (IYE) ETF Holdings & Analysis
ETFSectorBlackRock
$68.23-0.45%
52-week range$68.23
$45.12$68.72
What IYE does
The iShares U.S. Energy ETF is designed to mirror the financial performance of an index consisting of American-based stocks within the energy industry.
Fund profile
Issuer
BlackRock
Category
Sector
AUM
$1.90B
Holdings
10
52-week high
$68.72
52-week low
$45.12
Top holdings
| Holding | Weight | |
|---|---|---|
| EXXONMOBIL HOLDINGS CORP | 21.87% | |
| CHEVRON | 15.68% | |
| CONOCOPHILLIPS | 6.65% | |
| MARATHON PETROLEUM | 4.54% | |
| VALERO ENERGY CORP | 4.36% | |
| PHILLIPS 66 | 4.09% | |
| WILLIAMS | 3.76% | |
| SLB | 3.59% | |
| EOG RESOURCES | 3.21% | |
| BAKER HUGHES CLASS A | 2.59% |
Sector allocation
| Energy | 98.23% |
| Industrials | 0.03% |
| Technology | 1.74% |
Geographic allocation
| United States | 98.30% |
| United Kingdom | 1.25% |
| Other | 0.45% |
PortView Portfolio Insights
PortView analyzes how IYE fits your actual portfolio — position weight, ETF overlap with your other funds, sector and geographic exposure, concentration, and how this fund contributes to your portfolio risk and return. Connect a portfolio to see your personalized figures; PortView never shows another user's private holdings.
Analyze IYE in PortView →Related securities
Related stocks
Related ETFs
Frequently asked questions
- What does IYE track?
- IYE is the iShares U.S. Energy ETF, a Sector ETF issued by BlackRock.
- What is the expense ratio of IYE?
- Expense ratio data for IYE is shown on the page when available from our data provider.
- What are the largest holdings in IYE?
- Top holdings include XOM, CVX, COP, MPC, VLO.
- How can PortView analyze IYE overlap with other ETFs?
- PortView computes the holdings overlap between IYE and the other ETFs and stocks you own, plus your combined sector and geographic exposure, so you can see true diversification.
The information provided by PortView is for informational and educational purposes only and does not constitute investment advice. Market data may be delayed. Past performance does not guarantee future results.